A big hello to all the tourists, you probably haven't realised it, but today marks two years since you all checked out our new property while on the tour.A lot has changed since then, so as I sat here in isolation because of the virus I thought that I could add a little to this thread to show some of our progress.
There will be some caravan content
We started with a big back yard with lots of trees around the fence line, so that was the first job.
We removed a lot, but kept this one.
Looks a bit bigger than I expected
Told ya there was Caravan content.
The shed build went really well, 12 weeks from signing the contract to being able to drive cars, and vans, into it.During the build we had concentrated on moving all the house stuff, and cleaning up the existing workshop, so as soon as the shed was up we seemed to spend everyday driving up the freeway or packing/unpacking trailers.By Sept 2018 we were all moved, lucky that we had had 12 months settlement.
It has taken a while, but we now have some gardens , with flowers for me, and some garden art for Col.
Inside we have been able to have some of our stuff from Croydon, but not much , or any really, of the 50's era, it is still all in a spare room, awaiting it's fate
The picket fence and gates that separated the asphalt area from the back yard had to be removed for the shed build, so Col re cycled them to give us drive way gates, perfect.
Thanks for looking, apologies to anyone that wasn't on our 2018 Tour, but I hope that we can do something again once the world gets back to business.
Kris.